Job Name: PCA
Location: Wyoming, MI
Finish Date: September 2025
Job Description:
PCA expanded their facility that housed their glue process. Armock met with the owner and general contractor to design a ventilation system to help eliminate the haze created from their process. Two (2) 100% Outside Air VFD Make-up air units, 50,000 CFM, were installed to provide 6 air changes per hour. Sidewall exhaust fans were installed on the opposite side of the building to provide even airflow across the plant.





